Basic product identification
Core code: Product ID is 3BSE050090R65, ABB model identification is PFEA111-65, and the product name is uniformly “Tension Electronics PFEA111-65” (Tension Electronic Equipment)
Classification: Belonging to the sub field of “force measurement” under the “measurement and analysis” category, specifically corresponding to the Web Tension Measurement category, suitable for devices such as PFC300, PFT300, PFR100, PFT100, etc
Product specifications and attributes
Technical parameters: Supports 2 weighing sensor inputs, with voltage and current output (A+B) functions, and adjustable filtering output; Equipped with a display screen, it can display four types of measurement data: A, B, A+B, A-B; Comes with a CD user manual for the product
Physical and packaging information: The gross weight and net weight are both 1kg; the unit for packaging level 1 is 1 piece, and the minimum order quantity and order multiple are both 1 piece; The frame dimensions are labeled as “Spare_Parts” (spare parts), and the protection level is described as “Tension Electronics IP65” (IP65 level for tension electronic devices)
Trade and Compliance Information: Country of Origin is Sweden, Customs Tariff Number 85389091, UNSPSC Code 39120000; Not classified as WEEE (Waste Electrical and Electronic Equipment); Not ‘Made To Order’ (No), not ‘Quote Only’ (No), and in stock, located in Malm ö, Sweden
Installation precautions
First, the importance of industrial equipment installation
In modern industrial production, various equipment and machines are widely used in various fields, such as manufacturing, energy industry, chemical industry and so on. The installation of industrial equipment is directly related to production efficiency and product quality. Proper installation and commissioning of good equipment can ensure the stable operation of the production line, improve production efficiency and product quality, reduce maintenance costs, and ensure the safety of employees.
Second, the steps of industrial equipment installation
1. Preparation: Before the installation of industrial equipment, it is necessary to carry out adequate preparation work. This includes the tools and equipment required for installation, cleaning and preparation of the installation site, and making installation plans and schedules.
2. Determine the installation position: Determine the installation position of the equipment according to the requirements of the equipment and the layout of the production line. When determining the location, the weight and size of the equipment need to be considered, as well as the coordination of the equipment with the surrounding environment.
3. Install the device: Assemble and install the device according to the installation instructions. Ensure that the device is securely and accurately connected, while protecting the appearance and internal components of the device.
4. Connect power supplies and pipelines: For devices that require power supplies and power supplies, properly connect power supplies and pipelines. The connection of power supply and pipeline should comply with safety standards to avoid hazards such as electric shock and leakage.
5. Commissioning the device: After the installation is complete, you need to commission the device to ensure that the device can run properly. It includes checking the functions and performance of the equipment, adjusting the parameters and Settings of the equipment, and carrying out the necessary tests and inspections.
6. Training operators: After the installation of the equipment, it is necessary to train the operators to understand the operation methods and precautions of the equipment, and improve the operation skills and safety awareness of the employees.
Third, industrial equipment installation precautions
1. Safety first: When installing industrial equipment, safety is the most important consideration. You must operate in strict accordance with safety regulations and wear necessary protective equipment to ensure the safety of the workplace.
2. Strictly follow the equipment instructions: Industrial equipment usually comes with detailed installation instructions, you must carefully read and understand the contents of the instructions, and install the operation in accordance with the requirements of the instructions.
3. Pay attention to the assembly sequence: When installing the device, follow the correct assembly sequence to ensure that all components of the device are assembled correctly to avoid equipment failures or safety accidents caused by incorrect assembly sequence.

Leave a comment
Your email address will not be published. Required fields are marked *